← Back to tenders
Energy Spain TED Europa No deadline

Spain – Refrigerating equipment – Helium Refrigeration System (HRS) for Isotope Separation System (ISS) of ITER Fuel Cycle

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')

Deadline
Published
01 Sept 2026
Source
TED Europa
Reference
601126-2026

Deadline confirmed with the source today.

Description

The scope of this procurement procedure is the design, manufacturing, assembly, factory acceptance testing, transport and delivery of the Helium Refrigeration System (HRS) for the Isotope Separation System (ISS) within the Tritium Plant at ITER, based on Reversed Turbo-Brayton technology. The HRS will supply a cooling net power of approximately 1500 W at 18.5 K for the ISS of the ITER Tritium Plant. Optional scope: Option 1: factory performance testing; Option 2: technical assistance for on-site installation and final connection activities; Option 3: technical assistance for commissioning and site acceptance testing. Before the final call for tender, F4E may decide to remove certain options from the scope.

Categories

EnergyManufacturingTransport & Logistics

Keywords

EUTEDEuropaProcurementSpain42513200EnergyManufacturingTransport & Logistics